Green Bay Packaging approached Sika USA during flight operations trade-show in Florida. They worked directly with Green Bay Packaging representative Robin Richard to design a high performance hangar system. Sika only recommend Protective Coating Specialists, Inc of Appleton, WI to complete the install. The project took two weeks to complete from start to finish. The floor was shot blasted to provide proper profile with detailed diamond grinding around all perimeter walls and trench drains. We installed a moisture primer with a unique flexible membrane to absorb impacts. The final floor was 50-mils thick and the topcoat was a high gloss, chemical and UV resistant topcoat. The great looking floor was finished with a large 20’x15’ Green Bay Packaging logo centered in the hangar floor. Great looking floor with a little pizzazz!